The following are SPIE papers documenting various aspects of the HET, with first-authors listed for each, organized thematically (updated 15 Jul 2020)
- Primary Mirror (M1):
- Segment control system:
- Segment Alignment and Maintenance System (SAMS):
- SAMS development (John Booth) 20 Jul 2000
- Edge sensor deflections (Michael Stallcup) 5 Nov 2001
- LabVIEW software for SAMS (Drew Hall) 13 Dec 2002
- Segment alignment maintenance system (John Rakoczy) 4 Feb 2002
- HET Segment Alignment Maintenance System (Mark Adams) 4 Feb 2003
- Mirror figure maintenance with SAMS (John Rakoczy) 4 Feb 2003
- Segment Alignment Maintenance System (Povilas Palunas) 15 Sep 2004
- Mirror Alignment Recovery System (MARS):
- Global Radius-Of-Curvature (GROC):
- Wide Field Upgrade
- Design/tests:
- Hexapods:
- Optics:
- Alignment and wavefront sensors:
- WFU: metrology for alignment control (Hanshin Lee) 19 Jul 2010
- Phase retrieval and wavefront sensing (Hanshin Lee) 5 Aug 2010
- Wave-front sensors (Hanshin Lee) 5 Aug 2010
- WFU: wavefront sensors and alignment (Hanshin Lee) 5 Aug 2010
- WFU: metrology systems (Hanshin Lee) 27 Sep 2012
- HET metrology performance (Hanshin Lee) 6 Jul 2018
- Wavefront sensing and alignment (Hanshin Lee) 10 Jul 2018
- Tracker design/deployment:
- Lab tests of new tracker (John Good) 23 Jul 2010
- HET tracker upgrade design (Nicholas Mollison) 4 Aug 2010
- WFU tracker bridge design (Michael Worthington) 6 Aug 2010
- WFU force/safety system (Nicholas Mollison) 7 Aug 2010
- HET WFU drive system (Ian Soukup) 17 Sep 2012
- WFU tracker design/implementation (Joseph Beno) 17 Sep 2012
- WFU tracker design (Richard Hayes) 25 Sep 2012
- Lab tests of new tracker (John Good) 22 Jul 2014
- Prime Focus Instrument Package (PFIP):
- Facility Calibration Unit:
- Software:
- Status:
- WFU upgrade/status (John Booth) 28 Sep 2004
- WFU status (John Booth) 23 Jun 2006
- HET WFU and VIRUS status (Richard Savage) 10 Jul 2008
- HET WFU status (Richard Savage) 7 Aug 2010
- HET WFU status (Gary Hill) 27 Sep 2012
- Deployment of HET WFU (Gary Hill) 22 Jul 2014
- Deployment of HET WFU (Gary Hill) 27 Jul 2016
- WFU installation and verification (Hanshin Lee) 8 Aug 2016
- Mechanical performance of the WFU (John Good) 6 Jul 2018
- WFU completion (Gary Hill) 6 Jul 2018
- Queue operations:
- Image Quality:
- HET dome thermal conditioning (Paul Worthington) 25 Jul 2000
- Intrinsic Site Seeing at HET (Edwin Barker) 4 Feb 2003
- HET ventilation system upgrade (John Good) 4 Feb 2003
- DIMM platform (John Good) 28 Sep 2004
- Imaging performance (Povilas Palunas) 23 Jun 2006
- Wavefront sensing for Image Quality (Hanshin Lee) 13 Sep 2012
- Instruments:
- High-resolution spectrograph (HRS):
- Medium-resolution spectrograph (MRS):
- Low-resolution specotgraph (LRS):
- LRS optical design (Francisco Cobos Duenas) 9 Jul 1998
- LRS mechanical design (Gary Hill) 9 Jul 1998
- LRS (Gary Hill) 9 Jul 1998
- Multi-object spectroscopy (Marsha Wolf) 16 Aug 2000
- LRS J-band camera (Joseph Tufts) 16 Aug 2000
- VPH grism (Gary Hill) 30 Jan 2003
- LRS-J camera (Joseph Tufts) 7 Mar 2003
- LRS-J camera design (Carlos Tejada) 7 Mar 2003
- Low-resolution specotgraph mark 2 (LRS2):
- Habitable-zone Planet Finder (HPF):
- Design/concept:
- Production/deployment:
- HPF detection simulations (Ryan Terrien) 6 Feb 2013
- HPF environmental control system (Fred Hearty) 24 July 2014
- HPF calibration system (Samuel Halverson) 28 Jul 2014
- HPF control software (Chad Bender) 8 Aug 2016
- Temperature/pressure control for HPF (Gudmundur Stefansson) 9 Aug 2016
- HPF fiber feed (Shubham Kanodia) 1 Aug 2018
- HPF flux image generation (Joe Ninan) 2 Aug 2018
- Laser Frequency Comb (LFC):
- Updates/status:
- Visible Integral-Field Replicable Unit Spectrographs (VIRUS):
- Design/concept:
- Production/deployment:
- VIRUS optical tolerance (Hanshin Lee) 20 Jul 2010
- VIRUS fiber support and life test (Ian Soukup) 20 Jul 2010
- VIRUS production-line assembly (Jennifer Marshall) 20 Jul 2010
- VIRUS alignment/assembly (Amanda Collins) 21 Jul 2010
- VIRUS mechanical production (Brian Vattiat) 21 Jul 2010
- VIRUS integration (J Heisler) 7 Aug 2010
- VIRUS optical alignment with wavefront sensing (Hanshin Lee) 13 Sep 2012
- VPH evaluation for VIRUS (Taylor Chonis) 24 Sep 2012
- VIRUS assembly/alignment (Travis Prochaska) 24 Sep 2012
- VIRUS production initial results (Sarah Tuttle) 24 Sep 2012
- VIRUS collimators (Jennifer Marshall) 8 Jul 2014
- VIRUS assembly/testing (Andreas Kelz) 10 Jul 2014
- VIRUS production (Gary Hill) 10 Jul 2014
- VIRUS construction/alignment/installation (Sarah Tuttle) 14 Jul 2014
- VIRUS enclosures (Travis Prochaska) 6 Aug 2014
- VPH production for VIRUS (Taylor Chonis) 7 Aug 2014
- Wavefront sensors and VIRUS alignments (Hanshin Lee) 19 Aug 2014
- VIRUS first deployment (Gary Hill) 9 Aug 2016
- VIRUS early installation/commissioning (Sarah Tuttle) 9 Aug 2016
- VIRUS characterization (Briana Indahl) 9 Aug 2016
- CCD field lens alignment in VIRUS (Hanshin Lee) 10 Jul 2018
- VIRUS IFU deployment (Brian Vattiat) 10 Jul 2018
- Cryogenic system:
- Data reduction:
- Updates/status:
- Ancient history:
- HET mirror fabrication (David Pileri) 8 Sep 1995
- HET progress report (Thomas Sebring) 21 Mar 1997
- Tracker development (John Booth) 26 May 1998
- HET commissioning experience and plans (John Glaspey) 3 Jul 1998
- Observing script execution (Niall Gaffney) 3 Jul 1998
- HET 11-m segmented mirror (Victor Krabbendam) 25 Aug 1998
- HET early performance and status (Lawrence Ramsey) 25 Aug 1998
- HET 4-mirror spherical corrector (Robert Jungquist) 5 Oct 1999
- Early science from HET (Gary Hill) 29 Jun 2000
- HET operational model (Mark Adams) 25 Jul 2000
- HET night operations diagnostics (Craig Nance) 25 Jul 2000
- Reflections on HET commissioning (Thomas Barnes) 2 Aug 2000
- HET mirror performance (Mark Adams) 2 Aug 2000
- HET completion (John Booth) 4 Feb 2003
Last modified 5 weeks ago
Last modified on Mar 31, 2024 4:04:05 PM