wiki:HetProcedures/PowerOutage

Power Outage Procedures

last updated 01 Feb 2019

For a planned power outage of more than ~20 minutes duration with expected generator operation, or an unplanned outage where the generator operates correctly.

  • open UER and LER doors to allow air circulation,
  • in LER, shutdown dSpace, servo cabinets, and the two computers (these are not on generator power),
  • save locations of Mars stage controllers (they are not on generator power),
  • if the outage will affect the DIMM Telescope, shutdown the DIMM computer and electronics,
  • ... something else I forgot.

To restart things after the outage.

  • in LER, power on servo cabinets, dSpace, trkengtwo and trkdisplay computer,
  • restart control desk,
  • close doors to LER and UER,
  • restart Mars equipment,
  • you will have to home the Mars stage motors and return them to their original position,
  • restart the DIMM computer and electronics,
  • Virus spectrographs may be warm as the enclosure cooling in not on generator power,
  • connect to Hetsky as CTI to restart the cloud sensor,
  • ...more stuff I forgot.
Last modified 5 years ago Last modified on Feb 20, 2019 9:46:57 PM