Changes between Version 2 and Version 3 of HetProcedures/TO/degrade
- Timestamp:
- Sep 26, 2023 10:43:45 PM (8 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
HetProcedures/TO/degrade
v2 v3 19 19 20 20 • If you’re doing a dynamic test, do not move until the test is done as it will create false measurements, if not crash the test. 21 For example: For a test taking a total of 20 minutes, run ‘Degrade 10’, move, return to CCAS and realign, run ‘Degrade 10’ again.22 '''Record the time of when you command the motion and where you moved to.'''21 For example: For a test taking a total of 20 minutes, run ‘Degrade 10’, move, return to CCAS and realign, run ‘Degrade 10’ again. 22 '''Record the time of when you command the motion and where you moved to.''' 23 23 24 24 4. When the test finishes, return SCS to SAMS authority and let the SAMS measurements go through then do a ‘tighten-up’ stack. Mark as engineering as well and save reference and SCS ttp files. You can take HEFI measurements if time allows. '''Restart the wavescope software before stacking again to reset values.'''