Changes between Version 3 and Version 4 of HetProcedures/TO/degrade
- Timestamp:
- Sep 26, 2023 10:44:28 PM (8 months ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
HetProcedures/TO/degrade
v3 v4 18 18 3. In Wavescope console, enter ‘Degrade X’ where X is the number of minutes you’d like to run the test, between 10-30 minutes total. So, for a 10 minute test, you’d type ‘Degrade 10’. For an 18 minute test, ‘Degrade 18’ . Run for however much you think you can get in. 19 19 20 • If you’re doing a dynamic test, do not move until the test is done as it will create false measurements, if not crash the test. 21 For example: For a test taking a total of 20 minutes, run ‘Degrade 10’, move, return to CCAS and realign, run ‘Degrade 10’ again. 22 '''Record the time of when you command the motion and where you moved to.''' 20 • If you’re doing a dynamic test, do not move until the test is done as it will create false measurements, if not crash the test. For example: For a test taking a total of 20 minutes, run ‘Degrade 10’, move, return to CCAS and realign, run ‘Degrade 10’ again. 21 '''Record the time of when you command the motion and where you moved to.''' 23 22 24 23 4. When the test finishes, return SCS to SAMS authority and let the SAMS measurements go through then do a ‘tighten-up’ stack. Mark as engineering as well and save reference and SCS ttp files. You can take HEFI measurements if time allows. '''Restart the wavescope software before stacking again to reset values.'''