Changes between Version 1 and Version 2 of NightOperations/Commissioning/20161116
- Timestamp:
- Nov 16, 2016 7:40:10 PM (7 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/20161116
v1 v2 79 79 80 80 81 === Close-Loop Focus Tracks === 82 83 * Set up on a foc09 star in the usual way (i.e. use do_shuffle or gstar to put the V=9 star in DWFS8 and guide stars in gc1,gc2). 84 * Set up wf1/wf2 in usual way 85 * Record time in log 86 * Have TO close focus loop 87 * Check the DMI pipeline is running. 88 * Start Metrology loop and activate loop on DMI. 89 * Make sure OWFS that you want to guide focus on is well centered. 90 * Start and then Activate the metrology loop on the OWFS that you 91 would like to start guiding focus on. 92 * At end of track, record time 93 * After each track set, adjust GRoC 94 95 Niv and Jason have asked for a variety of structure AZ values, but we must stay away from AZ=64 (CCAS) as this is not implemented in the WFS pipeline yet. 96 97 98 99 100 === TEST 5: ACAM focus (THIS NEEDS WORK BEFORE WE UNDERSTAND THIS TEST!) === 81 === ACAM focus (THIS NEEDS WORK BEFORE WE UNDERSTAND THIS TEST!) === 101 82 * Insure that temperatures are stable and DIMM seeing is better than 1.5" 102 83 * Set up on geo-sat (probably GOES-14) … … 109 90 Analysis: Measure width of PSF to get acq focus curve and measure focus offset (should be close to zero). 110 91 111 === TEST 6:Dither test on DWFS9 in IFU 052 ===92 === Dither test on DWFS9 in IFU 052 === 112 93 113 94 Purpose: We want to see the reproducibility of the dithers imaged through the DWFS9 point grey camera which might be in IFU052. … … 146 127 147 128 Procedure: 148 * '''NOTE: LRS2-R is in IFU slot 057 ''' 129 149 130 * You can use shuffle with the setup files from {{{shuffle_config_matt}}} or to try to compenstate for the new ACAM angles try {{{shuffle_config_matt2}}} 150 * Do a blind offset setup, ie. do_shuffle RA DEC 0 X 057 0 0 test 131 * Do a blind offset setup, ie. do_shuffle RA DEC 0 X ??? 0 0 test 132 ''' The last part is vague and will be defined in the next 24h after LRS2 is re-installed.''' 151 133