Changes between Initial Version and Version 1 of NightOperations/Commissioning/Plans/20160313


Ignore:
Timestamp:
Mar 12, 2016 9:20:43 PM (8 years ago)
Author:
shetrone
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NightOperations/Commissioning/Plans/20160313

    v1 v1  
     1= 20160313 plan =
     2
     3== Check out ==
     4
     5Remember that GC1 is still not working so do not home probes.  Any probe you move will be your active probe for the night unless you reset the move history (see [wiki:HetProcedures/RA/guideprobes Guide Probe procedures])
     6
     7At the start of the night take a full set of LRS2 calibrations and inspect all images to make sure that everything is working.  Report any lamps not working.   Follow the procedures found in [wiki:HetProcedures/RA/lrs2 LRS2 and VIRUS operating procedures]
     8
     9== Night time activity ==
     10
     11* The goal for tonight should be to learn to offset from LRS2B to LRS2R.    This can be done simply with the ACQ and guide probe 2 and the positions given in [wiki:HetProcedures/RA/markers Current best position for markers]
     12       * Select target and send to TCS
     13       * Move Target to the lrs2b position on ACAM
     14       * guide on the ACAM
     15       * get the guide probe 2 set and well centered
     16       * start guiding on GC2 and stop guiding on ACAM
     17       * offset to lrs2r position example {{{syscmd -T 'offset_trajectory(dx_ang=-100, dy_ang=0, adjust_probes="true")'}}}
     18       * allow the GC2 guider to catch-up and drag the star to the fiducial.     
     19       * look at the final position on the ACAM and determine what values need to change in the dx_ang and dy_ang
     20       *
     21       * repeat until you can reliably make this offset at any Az.
     22       * Note the offset from lrs2r to lrs2b might not be the exact opposite sign as the move lrs2g to lrs2r
     23
     24*  If you are able to complete this exercise and it is clear please observe several different spetroscopic flux standards near the center of track in both lrs2b and lrs2r
     25
     26*  If you complete the above and it is clear then please observe sloan photometric standards in the ACAM and GC2 near the center of track.
     27
     28
     29