Changes between Version 4 and Version 5 of NightOperations/Commissioning/Plans/20160420
- Timestamp:
- Apr 20, 2016 1:24:45 AM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/Plans/20160420
v4 v5 64 64 * Send target to TCS and note the time 65 65 * Setup on LRS2 66 * Save an ACQ image and start continuous saves of the GC2 images 66 67 * Take appropriate length exposure (up to 20 minutes) and note the start time 67 68 * Fill in the night report 68 69 * Note the end of the exposure and move to the other LRS2 setup position 70 * Save an ACQ image to document position of target and start continuous saves of the GC2 images 69 71 * Take appropriate length exposure and note the start time 70 72 * Fill in the night report for this exposure