Changes between Version 1 and Version 2 of NightOperations/Commissioning/Plans/20161028
- Timestamp:
- Oct 27, 2016 10:48:27 PM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/Plans/20161028
v1 v2 1 1 = 20161028 Commissioning Plan = 2 2 3 Priorities for test are in the order listed in the plan below. 3 Priorities for test are in the order listed in the plan below. '''NOTE: The DMI should now be run for every trajectory with a 10 second interval time.''' 4 4 5 5 Highest Priority: Engineering; do any support for Hanshin or Randy in support of Hanshin. … … 152 152 Repeat test: choosing a new star at the next Az in the list: 180, 234 (twice) , 292, 335 (twice), 0. 153 153 154 === Drift test: GC1-GC2-ACQ, still need Y and diagonal === 155 156 Purpose: We want to see how much drift there is from one side of the IHMP to the other. Generally we want to guide on one GC and watch the others. This should be done in the south and in the west. 157 158 Procedure: 159 * Get a good stack with good groc (GROC < 250). 160 * Record the GROC value and the truss temp. 161 * Setup for a full track with good focus 162 * Start saving images with GC1, GC2 and ACAM 163 * TO should maintain focus 164 * Be sure to run the DMI with 10 second interval. 165 * At the end of the test be sure to report the GROC value and final truss temp. 166 167 Repeat the test for other required track. 168 169 170 154 171 == Science with LRS2-R and VIRUS Engineering == 155 172