  • NightOperations/Commissioning/Plans/20161028

    v1 v2  
    11= 20161028 Commissioning Plan =
    22
    3 Priorities for test are in the order listed in the plan below.
     3Priorities for test are in the order listed in the plan below.   '''NOTE:  The DMI should now be run for every trajectory with a 10 second interval time.'''
    44
    55Highest Priority:   Engineering; do any support for Hanshin or Randy in support of Hanshin.   
     
    152152Repeat test:  choosing a new star at the next Az in the list: 180, 234 (twice) , 292, 335 (twice), 0.
    153153
     154===  Drift test:  GC1-GC2-ACQ, still need Y and diagonal ===
     155
     156Purpose:   We want to see how much drift there is from one side of the IHMP to the other.  Generally we want to guide on one GC and watch the others.  This should be done in the south and in the west.
     157
     158Procedure:
     159 *  Get a good stack with good groc (GROC < 250).
     160 *  Record the GROC value and the truss temp.
     161 *  Setup for a full track with good focus
     162 *  Start saving images with GC1, GC2 and ACAM
     163 *  TO should maintain focus
     164 *  Be sure to run the DMI with 10 second interval.
     165 *  At the end of the test be sure to report the GROC value and final truss temp.
     166
     167Repeat the test for other required track.
     168
     169
     170
    154171 == Science with  LRS2-R and VIRUS Engineering ==
    155172