Changes between Version 10 and Version 11 of NightOperations/Commissioning/Plans/20161109
- Timestamp:
- Nov 10, 2016 11:20:55 PM (8 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/Plans/20161109
v10 v11 12 12 == Closed dome engineering for bad weather, or while stacking: == 13 13 14 === Long LRS2 -RFeAr exposures ===14 === Long LRS2 FeAr exposures === 15 15 Purpose: Obtain high S/N images for the longest wvaelength FeAr line. 16 16 * Use cal.y to take six 30-minute FeAr lamp spectra.