Changes between Version 1 and Version 2 of NightOperations/Commissioning/Plans/20161202
- Timestamp:
- Dec 1, 2016 3:52:27 PM (7 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/Plans/20161202
v1 v2 1 20161202 Commissioning Plan =1 = 20161202 Commissioning Plan = 2 2 3 3 … … 12 12 13 13 == On-sky engineering: == 14 15 === CWFS Focus Test === 16 17 * Stack the primary mirror 18 * Null out ANY tip-tilt offsets, best by re-starting TCS prior to this test 19 * Setup on a geostationary satellite as close as possible to the center of the tracking sphere 20 * insert and center CWFS 21 * Set focus with CWFS 22 * run CWFS with the loop active for 15 minutes, saving images and noting the start and stop time 14 23 15 24 === Run full tracks with bib camera+ to assess centroid drag ===