Changes between Version 1 and Version 2 of NightOperations/Commissioning/Plans/20161218


Ignore:
Timestamp:
Dec 18, 2016 3:00:20 AM (7 years ago)
Author:
shetrone
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NightOperations/Commissioning/Plans/20161218

    v1 v2  
    102102 * Select targets based on Priority and to a lesser extent modified priority
    103103 * Try to use WFS1 during science targets if possible NOTE:  Probably not possible for LRS2-B -> LRS2-R sequence tests.
    104 
    105 
     104 * Save PSU17-1-002 and PSU17-1-005 for times when other high priority targets can't be done, ie.  those programs have targets at all times of the night.
     105 * For the first half of the night:
     106     *  Do M17-1-001 in the only south track at the start of the night P0 visits then P1
     107     *  Do UT17-1-015 during dark time until P1 done
     108     *  Split gray time between UT17-1-011 and UT17-1-014 until P1 done NOTE:  For UT17-1-011 the PI put in their secondary preference in the tenths column of the priority, e.g. 1.0 higher priority than 1.1.
     109     
     110     
    106111
    107112