Changes between Version 10 and Version 11 of NightOperations/Commissioning/Plans/20180928
- Timestamp:
- Sep 29, 2018 11:32:48 PM (6 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
NightOperations/Commissioning/Plans/20180928
v10 v11 1 1 = Parts Borrowed From 20180726 = 2 2 3 == Twilights ==4 3 5 LRS2 and VIRUS twilights should be taken at the center of track position. Please follow the start of the night procedures on the wiki.6 7 8 4 == Priorities == 9 5 6 * Closed dome engineering tests (many of which can be done at OPS 7 * Twilight tests 10 8 * Open dome engineering tests 11 * Closed dome engineering tests12 9 * Science targets 13 10 * Long cals 11 14 12 15 13 == Closed dome engineering tests … … 47 45 * Note how much rotation is required from the central one to the new off-axis position and this is the delta angle to report to the TCS team. 48 46 47 48 == Twilight == 49 50 === Standard science twilights === 51 52 LRS2 and VIRUS twilights should be taken at the center of track position. Please follow the start of the night procedures on the wiki. 53 54 === Creating new Guider flats === 55 56 Take Guider B, g, r, i, none twilight flats for both gc1 and gc2. These can be started at the same time as the LRS2 or VIRUS twilights are going. 57 58 Procedure: 59 * Start with filters B, g, r, i and then none 60 * Take 5-10 images with 30k flux in the IFU (with RAW counts no need to have processing on). 61 * Follow the script XXXX to reduce the flats (TBD) 62 * Install the flats and any changes to the bias regions to {{{ /opt/het/hetdex/etc/configfiles/flats }}} 63 * Restart pas and the gui 64 * Look at the guiders and see if the bad fibers are removed by the flat... 65 * If all looks good inform the TCS team to save the flats to svn. 66 67 49 68 == Dome Open Tests == 50 69