Changes between Initial Version and Version 1 of NightOperations/Commissioning/Procedures/Twilight.v02


Ignore:
Timestamp:
Mar 14, 2016 10:43:51 PM (8 years ago)
Author:
sir
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NightOperations/Commissioning/Procedures/Twilight.v02

    v1 v1  
     1
     2
     3= Twilight images with PV to support mirror swaps v02 =
     4
     5
     6Purpose: We would like to image mirror in the array with the PV camera in twilight.
     7
     8Procedure:  [[BR]]
     9            1)  Move the dome and structure to 0 (155 if wind is an issue)[[BR]]
     10            2)  Move out the ACQ arm and move in the CWFS/PV arm[[BR]]
     11            3)  Move the slide to the PV  [[BR]]
     12            4)  Move the tracker to the center [[BR]]
     13            5)  save twilight image (flux ~150)[[BR]]
     14            4)  Move the tracker to the upper right [[BR]]
     15            5)  save twilight image (flux ~150)[[BR]]
     16            4)  Move the tracker to the lower right [[BR]]
     17            5)  save twilight image (flux ~150)[[BR]]
     18            4)  Move the tracker to the upper left [[BR]]
     19            5)  save twilight image (flux ~150)[[BR]]
     20            4)  Move the tracker to the lower left [[BR]]
     21            5)  save twilight image (flux ~150)[[BR]]
     22            6)  record all required data and move images to the NWD[[BR]]
     23
     24Data to save  [[BR]]
     25              1)  Save the data dump[[BR]]
     26              2)  Save the names of the twilight images saved[[BR]]
     27
     28Analysis:   Report saved data in the RA log