Changes between Version 3 and Version 4 of NightOperations/OPSManaul


Ignore:
Timestamp:
Jun 23, 2020 2:31:06 PM (4 years ago)
Author:
stevenj
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • NightOperations/OPSManaul

    v3 v4  
    1 = HET Operations Manual 
    2 
    3  
    4   The purpose of doing afternoon Operations Engineering is to insure that the telescope is in the correct state for conducting nighttime observations. The essential ideas are to:
    5 * Check early on the dome air conditioning to make sure that it is set properly for the anticipated sunset temperature.
    6 * Bring up systems needed for nighttime operations and, check that they are running correctly.
    7 * Recover from any issues found during Operations Engineering and recover from them before science begins.
    8 * Record all issues accurately in bugzilla and in the OPS comment sections.[[br]]
    9  
    10   This document is the expanded form of the "OPs Checklist".
    11 
    12 == Contents
    13 
    14 I.  [wiki:NightOperations/OPSManaul/Getting_Started Getting Started]
    15 II.  [wiki:NightOperations/OPSManaul/Exterior_Inspection Exterior Inspection, Start Air]
    16 III. [wiki:NightOperations/OPSManaul/Interior_Inspection Interior Inspection]
    17 IV. [wiki:NightOperations/OPSManaul/Setup_Desktop Setup Desktop and System Initialization]
    18 V. [wiki:NightOperations/OPSManaul/TCS_Trajectories TCS Check Out and Trajectories]
    19 VII. [wiki:NightOperations/OPSManaul/Finishing_Up Finishing Up]
    20 
    21 ''Appendices''[[br]]
    22 a.) [wiki:NightOperations/OPSManaul/Acronym_List Acronym List] [[br]]
    23 b.) [wiki:NightOperations/OPSManaul/Terminology Terminology]  [[br]]
    24 C.) [wiki:NightOperations/OPSManaul/Video_Channels  Video Channels ][[br]]
    25 d.) [wiki:NightOperations/OPSManaul/Weather_Closing_Criteria  Weather Closing Criteria ] [[br]]
    26 e.) [wiki:NightOperations/OPSManaul/Computers   Computers  ][[br]]
    27 
    28 
    29 
    30