  • NightOperations/RAProjects

    v2 v3  
    1111
    1212== John ==
     13specialities/projects apropos since HETmarkII
     14besides night-operations preparations/execution
     15-----------------------------------------------
     16A done as far as it can progress so far, paused
     17B waiting for resumed priority from mngmt, paused
     18C done to handing-off point, availability to revisit
     19D done
     20E scope currently under discussion
     21
     22TOPIC: control of observational phase-blocking/filling
     23to suit several contrasting science driven modes modes (C)
     24
     25TOPIC: statistics of HET transparency/skybrightness/IQ
     26data, broken down to calendrical month level; sky brightness
     27modeling in conjunction with this (A)
     28
     29TOPIC: (for agenda) scheduling optimization algorithm
     30endowed with freedom to lead or lag the naive best time
     31(target slot) approach out to some effciency criterion ;
     32used method of mock queues scheduled according to some
     33contrasting approaches; in short, contrasting with
     34HETmarkI where nonzero lead/lag was not explicit in
     35optimizing scheduling, a Priority-Trumps-All method
     36(taking in many hours as a whole) does well now (not
     37racking up time gapping interims), although it is good
     38to have a backup On-the-Fly ("what's the best target I
     39can do right now and onward from that choice?")
     40schedule re-constituting trigger ready for really disrupted
     41situations (A)
     42
     43TOPIC: nightcam hardware function, software control,
     44software reductions (B)
     45
     46TOPIC: backup satellite focus images analyzer (psfsat),
     47robust to hotpixels and streaks particularly, for if
     48and when the current default analyzer has apparently given
     49up (D, unless a backup also turns out necessary for nastier
     50type sky fields as well, in which case an analog robust
     51version psfsky, could be fashioned)
     52
     53TOPIC: work out decs for which the elevation 55
     54sidereal crossings proceed at the n x 45 deg
     55d(alt in deg)/d(az in great circle deg) directions,
     56and the start time corrections needed to plug into
     57these tracks from start to finish, working only
     58with htopx ; purpose was to get precisely timed and
     59filled box-pointing exercises for tests instead of
     60hit-and-miss outcomes (D)
     61
     62TOPIC: photometry from guiders, goals of intra-night
     63zeropoint control reliant on catalogued stars, and estimated
     64magnitudes for uncatalogued stars reliant on intra-night
     65zeropoint control (E)
    1366
    1467== Matt ==